More patients, same scanner
Ziekenhuis Oost-Limburg (ZOL) was facing a familiar pressure: one PET scanner, rising referrals, and waiting times stretching past a month. Rather than invest in new equipment, the department turned to NUCLARITY to unlock capacity from the infrastructure it already had.The result: a 40% reduction in scan time, a 20% increase in daily throughput, and PSMA waiting times down from over a month to approximately one week, all without adding a scanner or restructuring the clinical pathway.

.png)
